When is an asbestos survey needed?

When is an Asbestos Survey Needed? A Comprehensive Guide

An asbestos survey is fundamentally required before any refurbishment, demolition, or major construction work begins on a building built before the year 2000. The primary goal is to identify and manage any asbestos-containing materials (ACMs) to protect workers and the public from the health risks associated with asbestos exposure.

Understanding the Imperative: Why Surveys Matter

Asbestos, once widely used in construction for its fire-resistant and insulating properties, is now a known carcinogen. Inhaling asbestos fibers can lead to serious and often fatal diseases, including mesothelioma, lung cancer, and asbestosis. Therefore, understanding when an asbestos survey is needed is paramount for regulatory compliance and, more importantly, safeguarding human health.

The requirement for an asbestos survey isn’t simply a matter of best practice; it’s a legal obligation under various regulations, including the Control of Asbestos Regulations 2012 (CAR 2012) in the UK and similar legislation in other countries. Failure to comply can result in hefty fines and potential prosecution.

Trigger Events: Identifying the Need for a Survey

Several specific scenarios trigger the need for an asbestos survey. These include:

Refurbishment Activities

Any planned work that disturbs the fabric of a building requires a survey. This includes:

  • Significant renovations: Removing walls, ceilings, or flooring.
  • Installing new services: Wiring, plumbing, or HVAC systems.
  • Building extensions or modifications: Adding new rooms or altering existing structures.

Even seemingly minor refurbishment work can disturb asbestos. The survey must identify the location and type of any ACMs present, allowing for safe removal or encapsulation before work begins.

Demolition Projects

Demolition carries an inherently high risk of asbestos fiber release. A demolition survey, which is more intrusive and destructive than a refurbishment survey, is essential. This survey aims to identify all ACMs within the building, including those that may be hidden or inaccessible during a refurbishment survey.

Building Management and Maintenance

Even without planned work, responsible building owners and managers should proactively consider an asbestos survey to understand the potential risks within their premises. This is particularly important for:

  • Older buildings: Those constructed before 2000 are more likely to contain asbestos.
  • Buildings with a history of asbestos use: Buildings that were known to utilize asbestos-containing products.
  • Landlords and property managers: To ensure the safety of tenants and comply with legal obligations.

A management survey can help identify readily accessible ACMs and inform a comprehensive asbestos management plan.

Types of Asbestos Surveys: Choosing the Right Approach

There are two primary types of asbestos surveys:

  • Management Survey: This type of survey is designed to locate and identify, as far as reasonably practicable, ACMs that could be disturbed during normal occupancy or foreseeable maintenance activities. It involves visual inspection and may include sampling of suspected ACMs for laboratory analysis. The purpose is to create an asbestos register and management plan.

  • Refurbishment/Demolition Survey: This survey is required before any refurbishment or demolition work is carried out. It is a more intrusive and destructive survey than a management survey, as it aims to locate and identify all ACMs in the area where the work will be carried out. This survey may involve breaking into walls, floors, and ceilings to access hidden ACMs. Crucially, this survey is designed to ensure no workers are exposed to asbestos during the project.

The Survey Process: What to Expect

A professional asbestos survey should involve the following steps:

  1. Planning and Preparation: The surveyor will discuss the scope of the survey with the client and gather information about the building.
  2. Site Inspection: A thorough visual inspection of the building to identify potential ACMs.
  3. Sampling and Analysis: Taking samples of suspected ACMs and sending them to a UKAS-accredited laboratory for analysis.
  4. Reporting: A detailed report outlining the findings of the survey, including the location, type, and condition of any ACMs identified. This report will also include recommendations for managing the asbestos.

Choosing a Competent Surveyor: Ensuring Accuracy and Safety

Selecting a competent and qualified asbestos surveyor is critical. Look for surveyors who are:

  • Accredited: Ideally by a recognized accreditation body such as UKAS.
  • Experienced: With a proven track record of conducting asbestos surveys.
  • Knowledgeable: Up-to-date on the latest regulations and best practices.
  • Independent: Free from any conflicts of interest (e.g., not also involved in asbestos removal).

Frequently Asked Questions (FAQs)

FAQ 1: What happens if I don’t have an asbestos survey when I should?

Failure to conduct a required asbestos survey can result in significant legal consequences, including substantial fines, project delays, and potential prosecution. More importantly, it exposes workers and the public to the serious health risks associated with asbestos exposure.

FAQ 2: How long is an asbestos survey valid for?

The validity of an asbestos survey depends on the specific circumstances. A management survey should be reviewed regularly (typically annually) and updated if there are changes to the building or its use. A refurbishment/demolition survey is typically valid only for the specific project it was commissioned for, as the building may change during the works.

FAQ 3: How much does an asbestos survey cost?

The cost of an asbestos survey varies depending on the size and complexity of the building, the type of survey required, and the number of samples taken. Expect to pay anywhere from a few hundred pounds for a small management survey to several thousand pounds for a large and complex refurbishment/demolition survey. Getting multiple quotes is advisable.

FAQ 4: What if the asbestos survey report says there is asbestos present?

If the survey identifies asbestos, you will need to develop an asbestos management plan. This plan should outline how the asbestos will be managed, including measures to prevent disturbance and protect people from exposure. Options include removal by a licensed contractor, encapsulation, or enclosure.

FAQ 5: Can I remove asbestos myself?

Generally, no. Removing asbestos is a hazardous activity that should only be carried out by licensed asbestos removal contractors. There are very limited exceptions for minor, non-licensed work, but only if you are properly trained and have the necessary equipment. Attempting to remove asbestos yourself without the proper precautions is illegal and extremely dangerous.

FAQ 6: What is the difference between licensed and non-licensed asbestos work?

Licensed asbestos work involves the removal of higher-risk ACMs, such as asbestos insulation and sprayed coatings. This work requires a license from the relevant regulatory authority (e.g., the HSE in the UK) and must be carried out by trained and competent professionals. Non-licensed asbestos work involves the removal of lower-risk ACMs, such as asbestos cement, and may not require a license, but still requires proper training and precautions.

FAQ 7: What should I do if I accidentally disturb asbestos?

If you accidentally disturb asbestos, stop work immediately. Evacuate the area and prevent others from entering. Contact a licensed asbestos removal contractor to assess the situation and carry out any necessary remediation work.

FAQ 8: Does a homeowner need an asbestos survey before doing DIY?

Yes, any homeowner undertaking DIY work in a building built before 2000 should have an asbestos survey before starting work that could disturb the building’s fabric. This protects them, their family, and any contractors they may employ.

FAQ 9: What are common places to find asbestos in a building?

Common locations for asbestos include:

  • Insulation: Around pipes, boilers, and tanks.
  • Sprayed Coatings: On walls and ceilings for fireproofing or insulation.
  • Cement Products: Roofing sheets, wall panels, and drainage pipes.
  • Floor Tiles and Adhesives: Especially in older buildings.
  • Textiles: In fire blankets and some types of curtains.

FAQ 10: Are there any grants available to help with the cost of asbestos removal?

Grants and funding for asbestos removal are often limited and depend on your location and circumstances. Contact your local council or environmental agency to inquire about available schemes. Some energy efficiency grants may also cover asbestos removal if it is necessary to improve the building’s energy performance.

FAQ 11: What information should be included in an asbestos management plan?

An asbestos management plan should include:

  • A register of all ACMs identified in the building.
  • Risk assessments for each ACM.
  • Procedures for managing and controlling asbestos risks.
  • Details of any asbestos removal or encapsulation work carried out.
  • Emergency procedures in case of accidental disturbance.
  • Regular review and update schedule.

FAQ 12: Where can I find a list of accredited asbestos surveyors?

You can find a list of accredited asbestos surveyors on the website of your local accreditation body. In the UK, this is the United Kingdom Accreditation Service (UKAS). Checking their accreditation ensures the surveyor meets required standards and competencies.

Understanding when an asbestos survey is needed is not just about complying with regulations; it’s about protecting lives. By taking proactive steps to identify and manage asbestos, we can create safer environments for everyone.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top